Resource Library
-
Six Key Requirements for Effective Planning and Scheduling
Spotlight
Read moreOptimizing a modern-day manufacturing facility is a complex task. Manufacturers face an overwhelming array of conflicting demands, including reducing stock, improving lead times, increasing asset utilization and lowering overtime, all while cutting costs. This seemingly impossible challenge is further complicated by harsh constraints such as the availability of skilled labor, machine breakdowns,…
Search the resources library
-
Case Study
Migration of Legacy Semiconductor MES to Eyelit MES
Lfoundry, a leading semiconductor manufacturer, migrated its legacy Manufacturing Execution System to Eyelit MES with minimal downtime and no disruption…
-
Case Study
Providing a Data-Driven Solution to Streamline Manufacturing Processes
Eyelit partnered with Lyten to deliver a data-driven Manufacturing Execution System solution that streamlined manufacturing processes and improved operational performance.…
-
Case Study
Long-Term Planning Visibility with Short-Term Gains on the Line
SPOC Automation leveraged Eyelit’s integrated planning and execution solution to gain long-term strategic visibility while delivering immediate operational improvements. Seamless…
-
Case Study
Implementing Advanced Plant Scheduling to Unlock Supply Chain Value
Learn how a global medical-device manufacturer cuts planning cycle times, improves schedule adherence, and drives higher productivity with optimized plant…
-
Case Study
Case Study – Leading Med Dev Mfg Implements Advanced Plant Scheduling to Unlock SC Value
A leading global maker of medical devices had an ERP in place but did not have a formal plant planning…
-
Case Study
Case Study – Meeting Stringent Constraints while Increasing Paint Batches and Managing Two Tone Sequences
The client faced several challenges related to their group performance, extended supply chain, and the development of new business ventures.…
-
Case Study
Case Study – Order Moves Reduce Order to Delivery Cycle Times
A major automotive OEM who Has already deployed the Eyelit APS requested help in dealing with supply chain instability.
-
Case Study
Case Study – Boosting Productivity and Quality Control
At Eyelit, we face the same issue as all solutions providers: how to convey the practical value that our technology…
-
Case Study
Case Study | Production Planning Use Case Keeping Promises
A global manufacturer, with a strong brand and reputation for producing quality high-value products, started losing market share.
-
Case Study
Case Study Long-Term Planning Visibility with Short-Term Gains on the Line
The client faced challenges with their manual planning and scheduling process as component lead times increased, and production demand surged.
-
Case Study
Case Study Providing a Data-Driven Solution to Streamline Manufacturing Processes
The client encountered a significant challenge in their manufacturing processes, necessitating a tailored and robust MES solution to effectively document…
-
Case Study
Case Study Migration of Legacy Semiconductor MES to Eyelit Technologies MES
A semiconductor foundry, a vendor for the automotive and industrial sectors, migrated away from its existing legacy MES system which…
-
Case Study
Global Semiconductor ATP Order Planning – Case Study
Case Study Summary A global semiconductor company with revenue exceeding $10 billion faced critical operational challenges in managing supply chain…
-
Case Study
Toshiba Semiconductor Digital Twin Planning – Case Study
Case Study Summary Iwate Toshiba, a semiconductor fabricator located in Kitakami City in northern Japan, operates one of the most…
-
Case Study
Seagate Data Storage E2E Planning Solution – Case Study
Case Study Summary Industry: Electronic Data Storage Technology (Hard Disk Drives and Storage Solutions) Location: Global operations with 575 sites…
-
Case Study
Sarepta RNA Therapy Pharma Production Planning – Case Study
Case Study Summary Sarepta Therapeutics, a pharmaceutical company specializing in RNA and gene therapy manufacturing, operates in one of the…
-
Case Study
Samsung Electronics Network Supply Planning – Case Study
Case Study Summary Samsung Electronics’ Network Division, a global technology manufacturer with more than 2,300 employees generating US $1.3 billion…
-
Case Study
Pulse Electronics: From Manual Planning to Automated Global Coordination – Case Study
Case Study Summary Pulse Electronics, a Technitrol company and global leader in electronic component manufacturing, operates design centers, manufacturing facilities,…
-
Case Study
Semiconductor Manufacturer Reduced Cycle Times – Case Study
Case Study Summary A global semiconductor company with facilities across three continents struggled with the complex challenges of fabrication line…




