Resource

The Schedule that Keeps Up with the Floor

Manufacturers don’t usually struggle to build a plan — they struggle to keep one. The moment a shift starts, downtime, material shortages, and last-minute exceptions pull the schedule out of sync with what’s actually happening on the floor, and teams fall back on spreadsheets and phone calls to close the gap.

In this presentation from OTE 2026, Eyelit’s Head of Product for Advanced Planning & Scheduling, Celeste Lefebvre, and Solutions Architect Alec Washington walk through the eight things a plan needs to hold up in real-world conditions — and how four manufacturers, spanning secure document printing, medical devices, semiconductor fabs, and large one-off forgings, closed that gap using Agent EyeQ, Eyelit’s agentic AI layer.

To continue reading, Download the Full Presentation.

Related Resources